Helical circular stair stringer glue-up!

The beginning of the largest circular we have built to date. This helical inspired monster will have built in wall guards and negative rise infinity treads which will be backlit with LED's. The jig wall stands over 20' tall, so we had to build a temporary lamination station to get these glued up.

It took 11 of us to get this up and positioned in the right spot. More pics to come as this awesome stair comes to life.

Curved Railing - How We Do It!

Here is a time lapse video of a level curve railing glue-up.  We ripped the white oak into thin strips then glued all the strips together.  After the strips are coated in glue it is lifted up onto the blocks.  The blocks are screwed to the template/radius of the curve we require.  Once the rail is clamped we will leave it for 24hrs to dry.